POSITION(S) VACANT
Applications are invited for the following posts of PSDP funded project “Environmental Study and Determination of Environmental Flow (E-Flow) under 969 MW Neelum Jhelum Hydropower Project (NJHP)” being financed by Federal Government. The appointment will be made on contract basis initially for a period of (01) year, which will be extendable subject to satisfactory performance:
Name of post with PPS:
- Project Engineer PPS-8
- Junior Environmentalist PPS-7
- Sub-Engineer PPS-7
- Detail of Eligibility Criteria can be downloaded from website of Ministry of Water Resources at www.mowr.gov.pk.
- Covering letter/Application along with C. Vs and recent photographs may be sent to below mentioned address within 15 days of publication of this advertisement.
- Name of the post applied for must be written on the Right Corner of the envelop.
- Age relaxation is already incorporated into the provided maximum age limit.
- Incomplete applications or late received application will not be considered.
- Only Shortlisted candidates will be called for interview
- No TA/DA will be admissible for interview.
- The competent Authority has right to annul the process of recruitment partially, or as a whole, at any time without assigning any reason.
- The candidates providing unsubstantiated and or incorrect information will be liable to legal action or disqualification.
- Applicants already serving in Public sector must apply through proper channel and enclose departmental NOC/Experience certificate with the application.
- Â If candidate intends to apply for more than one post, separate application must be submitted for each post. Combined application submitted for more than one post shall be rejected.